Services Provided:
Structural Investigation, Condition Assessment, Remediation Design, Non-Destructive Testing
Sector:
Hospitality & Hotels
Client:
Redcape Hotel Group Pty Ltd
Location:
Moorooka
Stage 1 early works for Willow Hotel refurbishment demonstrating TRSC’s flexibility in providing scalable engineering solutions. Scope included complete visual condition record, existing documentation review, non-destructive investigation, and preliminary design set. The variation proposal structure showcases adaptability to evolving project requirements for major hotel group portfolio work.
Hotel refurbishments typically proceed in phases, allowing operators to keep portions of the building trading while work proceeds elsewhere. The Willow Hotel engagement reflects this staged approach, with TRSC providing structural engineering services for Stage 1 early works while leaving flexibility for additional phases as the project evolves. The initial scope covered condition assessment, existing documentation review, non-destructive investigation where needed, and preliminary design work sufficient to support planning and budgeting for subsequent stages. This type of engagement requires balancing thorough investigation with the reality that full project scope won’t be defined until early findings are understood.
The condition assessment began with reviewing whatever existing documentation was available, understanding what the original design intended and what modifications might have occurred over the building’s life. Non-destructive investigation techniques allowed us to verify conditions without requiring destructive opening up that would disrupt operations. The visual condition survey focused on areas relevant to the proposed refurbishment, documenting current conditions and identifying any issues that would affect design decisions. The preliminary design work developed concepts far enough to support budget estimating and planning for subsequent stages, without committing to detailed solutions before the full scope was defined.
The variation proposal documents the kind of scope adjustment that’s common in refurbishment work. As investigation reveals actual conditions and as design development proceeds, requirements sometimes expand beyond what was originally anticipated. Having a clear variation process allows scope adjustments to be managed transparently, with both parties understanding what’s being added and what the cost implications are. This flexibility matters in refurbishment work where surprises are common. Rather than trying to define everything at the start, the approach allows actual structural conditions revealed during investigation to inform what work is ultimately needed.
For clients managing multi-property portfolios, this transparency in scope management builds confidence that projects will stay on track budget-wise even when unexpected conditions arise. The staged approach means understanding what’s needed before committing to full project budgets, allowing informed decisions about how to proceed. Having a structural engineering partner who can work flexibly across their portfolio, adjusting scope as needed while maintaining consistent quality standards, provides efficiency in managing multiple concurrent renovation projects.
Send us a message with details about your project and we’ll get back to you within 24 hours to arrange a chat.
Connect with us directly by email or phone via the details below.
admin@trsc.au
1300 023 184