Form 15 & Form 12 RPEQ Certification

Compliance certificate for building design or specification, signed by an RPEQ

Form 15 & Form 12 RPEQ Certification

Form 15 QLD is the approved compliance certificate for building design or specification. A competent person states that an aspect of building work will, if carried out as stated, comply with the building assessment provisions. The authority is the Building Act 1975 section 10 and the Building Regulation 2021 sections 73 and 77. For structural design the competent person must be an RPEQ in the structural area. Form 15 is issued for a design or specification before or during building approval. It is not a certificate that an existing building is currently structurally adequate.

Form 12 is the aspect inspection certificate. An appointed competent person issues it for work that has been inspected. Form 16 is the inspection certificate. The three forms answer different questions, and one does not stand in for another. TRSC prepares Form 15 for structural design, and Form 12 where TRSC is the appointed competent person for an inspected aspect of the structural work.

Where a design depends on an existing building, the design still has to be grounded in what is there. TRSC inspects, reviews the drawings, and tests where the design needs measured properties. That investigation supports the design. The Form 15 still certifies the design or specification. It does not certify the present condition of the building.

Building certifiers ask for Form 15 when structural work needs a design or specification for approval: alterations, added loads, new openings, remediation design, and new structure. Send the drawings, the approval stage, and what the certifier has asked for. TRSC structural engineers in Brisbane will tell you whether the next step is a Form 15, a Form 12, or an investigation before either certificate can be prepared. Request a quote.

Technical Scope
Form 15 QLDForm 15 Queenslandwhat is a Form 15 in QLDwhen is a Form 15 required in QLDForm 15 certificationForm 12 vs Form 15Form 12 certificationRPEQ certificationQBCC Form 15Form 15 design certificateQueensland Building Regulation 2021building design compliance certificateperformance-based compliance
Related Case Studies
Q1 Tower
Surfers Paradise
48-hour emergency response · $483K total project value
Marina Mirage
Main Beach
37-year marine infrastructure · make-safe & monitor keeping asset serviceable during redevelopment
All case studies
Direct Contact

Speak with an RPEQ-qualified structural engineer about this service.

Capabilities

Form 15 design compliance certificate

Form 15 for a structural design or specification, signed by an RPEQ in the structural area, before or during building approval. The certificate states that the design will, if carried out as stated, comply with the building assessment provisions.

Form 12 aspect inspection certificate

Form 12 for structural work that has been inspected, where TRSC is the appointed competent person for that aspect. The certificate covers the work inspected. It is not a design certificate and it is not Form 16.

Performance-Based Compliance Assessment

Engineering assessment of existing buildings against NCC performance requirements under the existing building and Performance Solution pathways. Particularly relevant for heritage buildings and aged assets that do not comply with prescriptive deemed-to-satisfy provisions.

Form 15 for work on a heritage building

Form 15 for the structural design or specification of building work on a heritage place. The certificate covers that design. A separate investigation report covers the present condition of the fabric.

Design of repairs after damage

Where repair work needs building approval, Form 15 covers the repair design or specification. An opinion that a damaged building is safe to re-enter is an engineering assessment, not a Form 15.

Design that relies on an existing structure

Alterations and added loads often need measured capacity before the design can be signed. The investigation informs the design. Form 15 then covers the design, not a statement that the building is currently adequate.

Coordination with Building Certifiers

Direct liaison with private and local government building certifiers on the structural design certificate and on inspected aspects. TRSC provides the Form 15 or Form 12 the approval actually asks for.

Frequently Asked Questions

What is a Form 15 in QLD?

A Form 15 in QLD is the approved compliance certificate for building design or specification, under the Building Act 1975 section 10 and the Building Regulation 2021 sections 73 and 77. A competent person states that an aspect of building work will, if carried out as stated, comply with the building assessment provisions. For structural design that person must be an RPEQ in the structural area. It is issued before or during building approval. It is not a certificate that an existing building is currently structurally adequate.

When is a Form 15 required in QLD?

A building certifier asks for a Form 15 when an aspect of building work needs a design or specification certified before or during approval. Typical structural examples are alterations, added floor loads, new openings, remediation design, and new structure. The certificate covers that design. It does not replace an inspection of work already built, and it does not replace an engineering report on the present condition of an existing building. If you are unsure which document the certifier wants, contact TRSC with the approval condition.

What is the difference between Form 12 and Form 15?

Form 15 is the compliance certificate for a design or specification. The competent person states that the building work will, if carried out as stated, comply with the building assessment provisions. Form 12 is the aspect inspection certificate: an appointed competent person issues it for work that has been inspected. Form 16 is the inspection certificate. A Form 15 does not prove that completed work matches the drawings, and a Form 12 does not certify the design.

Does TRSC issue Form 15 without investigation?

No. Where the design depends on an existing building, TRSC does not sign a Form 15 from old drawings alone. The file records the drawings, the inspection, and any tests the design used. The certificate still covers the design or specification, not a claim that the building is currently structurally adequate. The signing RPEQ carries personal professional responsibility for that statement.

Who can issue Form 15 in Queensland?

For structural design, the competent person on a Form 15 must be a Registered Professional Engineer of Queensland in the structural area. Not every RPEQ holds structural registration. TRSC engineers hold RPEQ registration in Queensland. Check the area of practice on the Board of Professional Engineers of Queensland register before you engage an engineer to sign.

What is a QBCC Form 15 design certificate?

QBCC publishes Form 15 as the compliance certificate for building design or specification. An RPEQ in the structural area signs it for structural design and states that the design will, if carried out as stated, comply with the building assessment provisions. TRSC issues that certificate for structural design, including remediation design, before or during building approval. It is not a certificate that an existing building is currently structurally adequate, and it is not the inspection of completed work.

Book a consultation for Form 15 & Form 12 RPEQ Certification

Every engagement begins with a direct conversation with an RPEQ-qualified structural engineer. No sales intermediary, contact TRSC to discuss your asset and the scope of work required.